Leer South Photo

Leer South

Category: Industrial/Oil & Gas

Faced with an aggressive timeline, our team delivered critical site development services at Leer South Mine with speed and precision. In a fast-tracked operation, we moved over 50,000 cubic yards of earth, preparing the site for essential drilling operations ahead of schedule.

The project included the installation of a stabilized pad and a fully engineered pond to support ongoing drilling activities, designed with durability and performance in mind. Throughout the process, we ensured strict adherence to environmental controls and compliance standards, implementing erosion and sedimentation measures to protect surrounding ecosystems.



Back to Projects