PPG Paints Arena, Heinz Field, PNC Ballpark
Category: Entertainment Facilities
Work across multiple components of the development included a fully operational underground utilities installation for PPG Paints Arena, featuring water, sanitary sewer, and storm drainage systems. For Heinz Field, nearly 50,000 cubic yards of earth were excavated and shaped to form the main playing surface, with additional work including perimeter drainage installation and comprehensive soil erosion and sediment control. At PNC Ballpark site, excavation and backfilling were performed to support the installation of foundations, pile caps, and associated structures necessary for the construction of the park.
Back to Projects